Running out of stock costs more than the lost sale. A customer who walks out of your shop without what they came for might not come back. A kitchen without butter can't make croissants. A distributor who can't deliver gives the retailer a reason to call someone else.
Most small businesses handle this with gut feel: someone glances at the shelf and says "we're getting low, better order". That works until the person who always notices is on leave, or the supplier takes longer than usual.
A reorder level replaces gut feel with a number. When stock falls to that number, you order. That's it. This guide shows how to work it out with simple arithmetic.
What a reorder level is
A reorder level (also called a reorder point) is the stock quantity at which you place a new order. It's set high enough that the stock you have left will last until the new delivery arrives, with a little extra in case things go wrong.
It depends on three things:
- How fast you use the item: your average daily usage.
- How long the supplier takes: the lead time, from placing the order to having the stock on your shelf.
- How much cushion you want: safety stock, for busy days and late deliveries.
The formula:
Reorder level = (average daily usage × lead time in days) + safety stock
A simple way to set safety stock is to choose a number of "safety days":
Safety stock = average daily usage × safety days
Step 1: work out average daily usage
Look at the last four weeks. How much of the item did you use or sell? Divide by the number of days.
Take four weeks rather than one, so that one unusually busy or quiet week doesn't skew the number. If your business closes on Sundays, divide by the days you were actually open.
If you don't have records, count. Note the stock today, add any deliveries over the next two weeks, count again at the end, and do the arithmetic. It's tedious once, and then you'll have a real number.
Step 2: find your real lead time
Lead time is not what the supplier promises. It's how long it actually takes from the moment you decide to order until the stock is usable. Include:
- The time before someone actually places the order (often a day)
- The supplier's delivery time
- Any time to unload, check and shelve
If your supplier says "next day" but you only place orders on Mondays and Thursdays, your real lead time might be three or four days.
Step 3: choose safety days
Safety days cover the gap between average and bad days. As a rough guide:
- 1 day for items with a reliable supplier and steady demand
- 2–3 days for items where demand jumps around or the supplier is sometimes late
- More for anything you absolutely can't run out of, or anything with a long, unpredictable lead time
There's no perfect answer. Too little and you'll run out on busy days; too much and you tie up cash and shelf space. Start with a reasonable guess and adjust after a month.
A worked example: a bakery in Pune
Imagine a bakery in Pune. Over the last 28 days, it used 980 kg of maida, 168 kg of butter, 420 kg of sugar and 3,360 cake boxes.
First, average daily usage:
- Maida: 980 ÷ 28 = 35 kg a day
- Butter: 168 ÷ 28 = 6 kg a day
- Sugar: 420 ÷ 28 = 15 kg a day
- Cake boxes: 3,360 ÷ 28 = 120 boxes a day
Next, the bakery notes its real lead times and picks safety days:
| Item | Daily use | Lead time | Safety days | Lead-time use | Safety stock | Reorder level |
|---|---|---|---|---|---|---|
| Maida | 35 kg | 3 days | 2 | 105 kg | 70 kg | 175 kg |
| Butter | 6 kg | 2 days | 1 | 12 kg | 6 kg | 18 kg |
| Sugar | 15 kg | 2 days | 1 | 30 kg | 15 kg | 45 kg |
| Cake boxes | 120 | 7 days | 3 | 840 | 360 | 1,200 |
Take maida. The bakery uses 35 kg a day and the supplier takes 3 days, so it needs 35 × 3 = 105 kg to last until a delivery arrives. Two safety days add 35 × 2 = 70 kg. The reorder level is 105 + 70 = 175 kg.
Cake boxes have the highest reorder level relative to daily use, because the printer takes a full week. That's exactly the kind of item that runs out when nobody's watching.
How much to order
The reorder level tells you when to order. You still need to decide how much.
A simple approach: order enough to cover a fixed period, such as a week, then round to the supplier's pack size.
For the bakery's maida, a week's usage is 35 × 7 = 245 kg. Maida comes in 50 kg bags, so it orders 5 bags, which is 250 kg.
Let's check that it works. Stock falls to 175 kg and the bakery orders. Over the 3-day lead time it uses about 105 kg, so it has about 70 kg left when the delivery arrives. Add 250 kg and it's back up to 320 kg. The 70 kg it had left is exactly the safety stock, untouched on an average week and there to cover a busy one.
Adjusting for seasons and festivals
Usage isn't constant. A bakery's Diwali and Christmas weeks look nothing like a rainy Tuesday in July.
Before a known busy period, recalculate with the expected usage. If the bakery expects to use twice as much maida during the festival weeks, 70 kg a day, the reorder level becomes:
70 × 3 + 70 × 2 = 210 + 140 = 350 kg
Raise it a week or two before the season starts, and lower it again afterwards. Otherwise you'll carry festival-level stock into a quiet month.
Slow movers and expensive items
Not every item needs the same care.
- Slow movers (a few units a month): a reorder level of 1 or 2 is often enough, or simply order when you sell the last one, if the supplier is quick.
- Expensive items: keep safety days low and check them more often. Holding extra stock of something costly ties up cash.
- Cheap, essential items (packaging, cleaning supplies): be generous. Running out costs far more than the extra stock.
Keep the numbers honest
A reorder level is only useful if the stock figure it's compared to is accurate. That means:
- Record every delivery when it arrives, not at the end of the week.
- Record what goes out: sales, use in production, waste and damage.
- Count regularly. A monthly count of everything, or a weekly count of your most important 20 items, catches mistakes and theft before they grow.
- Review reorder levels every few months, or whenever a supplier or your sales change noticeably.
Reorder level checklist
- List your most important 20–30 items first; don't start with everything
- Work out average daily usage from the last four weeks
- Measure the real lead time, including the delay before you order
- Pick safety days based on how reliable demand and supply are
- Calculate the reorder level and write it down against each item
- Decide an order quantity, rounded to pack size
- Raise levels before festivals and busy seasons, lower them after
- Count stock regularly so the numbers stay true
Doing it in NextFly EMS
The Inventory module in NextFly EMS has a reorder level on every product.
When you add a product, you set its unit (pcs, kg, box, dozen and so on), an opening stock and a reorder level. Quantities can include decimals, so 12.5 kg of butter is fine. From then on, stock changes through three simple actions:
- Receive stock when a delivery arrives
- Remove stock for sales, use or waste
- Count / adjust when you do a physical count, with a note such as "monthly stocktake". The difference is recorded so you can see what changed
Any product at or below its reorder level is flagged as low stock. The products list has a Show low stock filter that turns it into a ready-made shopping list, and when a removal takes a product down to its reorder level or below, it's recorded in the workspace activity. Stock can't be removed below zero, so the balance always reflects what's really there.
Your team can record stock in and out from the mobile app as it happens, while only admins can change products, counts and costs.
To try it, create a free workspace, add your top 20 products with the reorder levels you worked out above, and watch the low-stock list for a couple of weeks. If you'd like help setting it up, book a demo.
Conclusion
You don't need forecasting software to stop running out. Two numbers you can find this week, daily usage and real lead time, plus a sensible cushion, give you a reorder level for every product. Write it down, record stock movements as they happen, and order when you hit the number. Then adjust as you learn. That's most of good stock control for a small business.